CUA HOI CABLE CAR
- Location
- NGHE AN
- Project type
- Cable Car System
- Partner
- VINPEARL LAND JOINT STOCK COMPANY
- Year
- 2019
- Item
- Construction Supervision & Equipment Installation

A Large-Scale Sea-Crossing Cable Car System
The Cua Hoi – Hon Ngu Cable Car spans 3.5 km across the sea, connecting the mainland with Song Ngu Island. The large-scale project required close coordination among infrastructure works, cable car tower structures, and specialized equipment installation.
BILCO’s Construction Supervision Role
BILCO provided construction supervision for both civil works and cable car equipment installation. BILCO’s engineering team closely monitored site activities, inspected technical works, and coordinated timely responses to issues arising during construction, ensuring compliance with the approved design and safety standards.
Ensuring System Integration & Safety
Supervising a sea-crossing cable car system requires continuous assessment from construction through completion. BILCO focused on quality control for each work package in relation to the overall system, contributing to the project’s timely completion and safe, stable operation.